Material status
The Material Status feature gives you an information of the material availability of each production order.
The Material Status is calculated for each component of a production order (only for firm planned and relased orders).
-
Avaliable: completely avaliable
-
Partially avaliable: not completely avaliable
-
Blank: not avaliable
You can launch the calculation of the Material Status, from the Sequence Planning or from the Planning Setup. The Material Status is shown on each production order and on the Sequence Planning.
On the Planning setup (MPL) from Related->Planning calculation it is possible to execute the planning according to the setup set and it is also possible to calculate the Material Status.